Post-‘Kristine’ efforts futile without urgent dike reconstruction— Oas Mayor
"We might need semi-dam dikes to hold the river's water capacity, while the Bato Lake needs desiltation. But our urgent need is to block the side of the river with collapsed dike," Mayor Domingo Escoto Jr. said.

